Families / Build

Architect

Designs buildings and carries them through permitting and construction. Long licensure, long projects, visible results.

Pay band (est.)
$78k–$140k
Time to competence
8 years
Licence
Required
Setting
mixed
Leverage
medium
Place constraint
medium
Physical demand
22/100
Hours burden
62/100

Factor percentiles

Percentile against the whole curated set. Higher is better on that factor only.

  • Play68th

    Absorbing rather than merely paid.

  • Specific knowledge64th

    A combination of skills that is hard to copy.

  • Leverage49th

    Output that scales through code, media, capital or crew.

  • Demand30th

    Durability and shortage, scored conservatively.

  • Pay66th

    Mid-career floor and the range above it.

  • Body71th

    Inverse of physical demand and hours.

  • Autonomy63th

    Control of methods and time.

  • People fit77th

    Distance from your preferred people level.

  • Place flexibility59th

    Remote fit and freedom from specific metros.

  • Time to skill16th

    Inverse of years to competence.

  • Meaning load43th

    Care, craft and stewardship weight. Not a moral score.

  • Downside tolerance44th

    Inverse of named risk to body, market or platform.

Downside

Pay lags the training; income tracks construction cycles.

Examine this against your weights

The percentiles above use the default weights. Set your own on the ranking and this vocation moves with them.

  • Place constraint is medium. Where you live is analysed at locationistics.com.
  • Hours burden is 62/100 and people intensity 65/100. Who you are with is analysed at relationistics.com.

Source note: BLS/AIA-style patterns; estimate. All figures are estimates for comparison.